Proposal of the hospital’s site modernization with a medium-term plan (about 10 years) and a long-term plan (up to 20 years). The main objective was to prepare an optimal solution of relocating most of the medical clinics and departments, including the administrative facilities from the Borska premises to the Lochotín premises. The concept of construction modifications is designed in several stages – the first stage includes the construction of a new pavilion of surgical specialities, including its interconnection with other existing buildings using an underground and overground corridor. Processing of an investment development plan, and volumetric study of the pavilion.