Předchozí projekt

Žádné předchozí

Další projekt

Žádné další

Vista Wellness Hotel ****

Popis projektu

Vista **** Wellness Hotel Dolni Morava

New building of four-star hotel with spa and congress area. Hotel capacity 100 rooms 6 suites. The hotel is part of the project of the extensive ski area Dolní Morava.

The facades are dominated by local traditionally used materials. A stone rootstock made of local stone evokes the plinth of mountain huts. The wooden cladding of the residential part is made of untreated larch decks. The gradual natural aging of the cladding will allow the building to blend in with the beautiful surrounding nature.
The building consists of two basic masses, the stone plinth of the hinterland of the hotel and the wooden three storey blocks of hotel rooms. The two basic elements are separated by a richly glazed entrance floor, which allows a panoramic view of the beautiful surroundings. This part connects the two facilities communicatively and at the same time acoustically separates them.

The entrance hall with reception is located in the center of the layout and divides the floor plan into the left part of the restaurants and the right part of the facilities. This hall is the communication center of the entire hotel. Through the elevators and the main staircase it is connected to the facilities on the lower floors as well as to the accommodation section above it.
The hotel restaurant offers a magnificent view of the surroundings not only from the large terrace, but also through the all-glass facade. The á la carte restaurant is designed as a sheltered intimate space where visitors can enjoy the culinary specialties offered. The reception is connected to the office operations of the hotel management and a spacious hotel ski storage room with direct access.

Part of the wellness world is a Finnish sauna, a steam room, a kneipp walkway, a jacuzzi and a swimming pool, another option is a visit to the fitness room or several types of massages.

Project documentation in BIM

K4 a.s. developed an architectural study, which was followed up with complete project documentation.

In the project, CADvent lindab BIM software was used to coordinate the installation of the TZB and the 3D building model. Thanks to this, all changes in the project were displayed to all TZB professions in real time and they could be reflected in their parts of the project.

Link to the hotel website www.hotel-dolnimorava.cz

Informace

Typ:
Housing and Services
Investor:
SNĚZNIK a.s.
Rok realizace:
2009-2012
Rozsah činnosti:
Construction Design
Výše investice
100 až 1000 mil. Kč