Construction of a production hall, a development center and an office part for LIFOCOLOR, which is engaged in the production of color concentrates and additives for thermoplastics.
The LIFOCOLOR production facility was built in the Černovická terasa industrial zone in Brno. The built-up area is about 4,200 m². The reason for the construction was to expand the production of LIFOCOLOR, when the existing production capacities were no longer enough to cover the planned sales.
The entire complex consists of a three-story administrative building, a development center with a glass facade and a hall with a height of 12.5 meters, which serves as a production and warehouse.
K4 a.s. was the general designer and at the same time managed the construction itself.