Filter by:

Typology
Year of Implementation
Investment Amount
Scope of Project
Grazie! Your submission has been received!
Oops! Something went wrong while submitting the form.
Filtered by:
zavřít ikona
Tag template
Showing 0 of 0 results
Children's spa with speleotherapy Ostrov u Macocha
2019
Construction Design
Projektování staveb
Healthcare and Science
100 až 1000 mil. Kč
2019

3rd place in the architectural competition for the project and construction (Design&Build) of a children's spa with speleotherapy in Ostrov u Macocha.

The design of the site for treatment with speleotherapy taking place in the nearby Imperial Cave. Emphasis placed on healthy indoor climate and low operating costs. The complex includes extensive landscaping, sports facilities, a seawater swimming pool, medical facilities, social outdoor and indoor areas and an inpatient section. The material solution mirrors the surrounding landscape and thus becomes an integral part of it.

Waltrovka Dynamica
2016-2018
Construction Management
Řízení výstavby
Administration
Business
více než 1000 mil. Kč
2018

WALTROVKA DYNAMICA

Administrative building within the Waltrovka complex with a leasable area of 16,000 m² of office and retail space. With its shape and architecture, it follows the Aviatica building and thus completes the face of the entire Waltrovka development towards Radlická Street. The contract was managed by the Construction management system.

Fitouts of rental units

Part of the services was the realization of fitouts of the below rental units in the form of construction management.

Adidas

Atalian

Electrotrance

Canteen

MVV Energy

Nuovo lavoro

Strabag

University Hospital Brno – operating rooms
2017-2018
Construction Management
Řízení výstavby
Healthcare and Science
100 až 1000 mil. Kč
2018

Reconstruction of the central operating rooms of the University Hospital Brno

Management of the implementation of construction and assembly works to restore the operation of operating rooms in the premises of the University Hospital Brno in Bohunice.

Work on the restoration of the entire complex of operating rooms was carried out in such a way as to minimize the impact on the operation of this important part of the operation of the University Hospital Brno. K4 a.s. performed the following services on the above-mentioned construction:

- the performance of technical supervision of the investor of the construction and technological part during the implementation of the construction,

- OSH coordinator — supervision of compliance with the principles of occupational safety, occupational health and environmental protection,

- coordination of activities during the approval process.

Waltrovka Mechanica
2016-2018
Construction Management
Řízení výstavby
Administration
Business
více než 1000 mil. Kč
2018

WALTROVKA MECHANICA

Mechanica is part of the Waltrovka project, which is located closest to the metro station B Jinonice, whose vestibule is connected by a pedestrian footbridge. Thus, new shops, restaurants and other services were created in the adjacent central square to bring this part of Waltrovka to life appropriately. Mechanica presents a total of 35,000 m² of office and retail space, offering users a clean and efficient office layout design with a rich range of shops and services on the ground floor of all three buildings. The contract was managed by the Construction management system.

Fitouts of rental units

Part of the services was the realization of fitouts of the below rental units in the form of construction management.

AmRest

Beiersdorf

Caparol

HSH Chemistry

Air Produkter

PRG

Schindler

Census

Tesa Tapes

Trilux

Vitana (Orkla)

V Invest

Vetoquinol

Kozlovna

CTP – CTParks
2003–2018
Construction Design
Projektování staveb
Industry and Logistics
více než 1000 mil. Kč
2018

About CTP Invest

CTP Invest is one of the largest developers of industrial, logistics and office real estate in Central and Eastern Europe. In our republic, over the past years it has built a network of so-called. CTParks, in which it leases production and storage facilities to a wide range of companies.

About CTParks Design

Between 2003 and 2018, K4 processed project documentation for a number of CTParks in the Czech Republic in Blučina, Brno, Hrušky, Humpolec, Cheb, Kvasiny, Modřice, Odrava, Okryška, Ostrava, Pohořelice, Prague, Voděrady and in Hungary in Tatabánya. In these industrial and logistics parks, many important companies found their production and storage facilities (e.g. ABB, Acer, ADC Krone, Andrew, Balzers, BENQ, Bernex, BOC, Bodycote, Coloplast, CTS, CSAD, Danaher, DHL, Electro World, Faurecia, Fermat, Gebruder Weiss, GDX, Gigabyte, GreneKramp, Honeywell, HTC, IFE, IMI Norgree, Inventec, Kompan, Lagermax, Levi's, Makramp Cash&Carry, Maehler&Koege, Michel, Mergon, Moeller, Moduslink, Nitto Denko, Nunner, Pilkington, PSM, PST, Rosso Steel, Rossignol, Ringier, RR Donelly, SCE, Seaborn, Schenker, Siemon, UPS, ViskoTeepak, Wistron and others). The total projected area of these indoor buildings is approximately 900,000 m², estimated investment costs of more than 10 billion. CZK.

FN Pilsen, Investment Development Plan (general)
2018
Construction Design
Projektování staveb
Healthcare and Science
více než 1000 mil. Kč
2018

Proposal for modernization of the hospital premises with a medium-term outlook (about 10 years) and with a long-term outlook (up to 20 years). The main objective was to propose an optimal solution for the transfer of most health clinics and departments, including administrative facilities from the Borsko FN campus to the Lhotín campus. The concept of building modifications is proposed in several stages — part of the 1st stage is the construction of a new pavilion of surgical disciplines, including its interconnection with other existing buildings by means of an underground and above-ground corridor. Development of investment development plan, volume study of the pavilion.

Clarion Grandhotel Zlaty Lev Liberec
2018
Construction Management
Řízení výstavby
Housing and Services
10 až 100 mil. Kč
2018

Clarion Grandhotel Zlatý Lev in Liberec belongs to the Clarion hotel network of CPI Hotels. In the past, K4 managed the construction of the Clarion Congress Hotel Prague and the preparatory phase of the Clarion Congress Hotel Olomouc, while also participating in the design of the Olomouc hotel.

The reconstruction of the interior of the Clarion Grandhotel Zlatý Lev in Liberec took place in the hotel rooms located on two floors and consisted mainly in the construction of the sanitary facilities, new wiring and weak currents, the installation and commissioning of new air conditioning units and the stabilization of wooden floors with the replacement of the floor covering in these premises. In addition, the technology of the original passenger elevator was completely replaced with a new one, with the change of the door part of the elevator and the construction of a new elevator shaft, including the installation of a new passenger elevator.

During the reconstruction of the hotel, K4 a.s. provided the client with the services of a project manager and technical supervision of the investor.

Brno Technology Park
2005—2017
Construction Management, Construction Design
Projektování staveb
Řízení výstavby
Administration
Industry and Logistics
více než 1000 mil. Kč
2017

Czech Technology Park Brno Project

The idea of the Brno Technology Park originated in the early 1990s. On the urban design concept of the British architect Peter Foggo, a bold plan began to be realized, which had to be modified over time for various reasons, but the basic urban idea — to integrate industrial, technological and administrative functions naturally into the urban fabric — took its toll. The administrative complex Czech Technology Park Brno is a campus-type business park, which includes retail, restaurant and other service services located in a pleasant green park.

K4 and Technology Park Brno

Our company started cooperation with Technology Park in 2005. Gradually until 2017, we carried out design work, engineering activities and construction management at several stages of the construction of this park. Thus, we participated in the construction of administrative buildings and high-tech production halls for a number of renowned companies, such as e.g. FEI Czech Republic, Siemens, SGI, Timken, Czech Mobil, Honeywell Controls, Symbol Technologies, Red Hat, and IBM.

Tesco
2002—2017
Construction Management, Construction Design
Řízení výstavby
Projektování staveb
Business
více než 1000 mil. Kč
2017

Construction and remodeling of Tesco business units

For the investor Tesco Stores CR, we implemented the construction and redevelopment of the following business units: Tesco Boskovice, Tesco Břeclav, Tesco Brno Shopping Park, Tesco Campus Square Brno, Tesco Frýdek-Místek — completion of hypermarket and shopping gallery, Tesco Havířov, Tesco Jihlava, Tesco Karviná, Tesco Kroměříž, Tesco Martin, Tesco Opava — hypermarket and shopping gallery, Tesco Ostrava-Třebovice — business gallery and tenant coordination, Tesco Písek, Tesco Přerov, Tesco Šaľa, Tesco Trnava, Tesco Uherský Brod, Tesco Valašské Meziříčí, Tesco Veselí above Luznici.

Design work of new buildings of retail stores

For the investor Tesco Stores ČR, we processed various stages of design work on the projects listed below, such as project documentation for building permits, construction execution, copyright supervision and possibly performed engineering activities.

Expansion of Tesco Plzen hypermarket

Hypermarket Tesco Vyskov

Tesco Express — Belehradská, Prague 2

Tesco Brno Julianov

What do clients say about us?

Nová Zbrojovka

Miroslav Pekník

View the project

Roderick Barker

Technology Park Brno

View the project

Čtvrť pod Hády

Ing. Dalibor Lamka

The company K4 a.s. worked as the general designer on the Pod Hády district project since 2019.

Initially, they focused on the optimization of a study for the 1st phase of construction, followed by subsequent stages of project documentation (DSP and OPS) for this phase. Additionally, in the years 2021 and 2022, they also prepared the EIA for further phases of this extensive project (phases 2 and 3).

The collaboration with K4 proceeded essentially without issues, despite relatively extensive changes in the assignment during its course. The project documentation was processed properly and in accordance with the signed contract. We particularly appreciate the good coordination of the various stages of such a comprehensive project in our collaboration with K4.

Ponava City

Ing. Mark Zaduban

The company K4 a.s. served as the general designer on the PONAVA CITY project since 2016.

Initially, they worked on a study in collaboration with the project architects, followed by subsequent stages of project documentation (EIA, DSP, DVZ, and OPS). Simultaneously, they also provided author's supervision during the construction.

Collaboration with K4 proceeded without major issues, despite relatively extensive changes in the assignment during its course.