Extension of two production halls of Parker Hannifin factory in Sadské. The project also included the relocation and construction of new underground utilities, the relocation of a liquid nitrogen storage tank, road modification and minor landscaping. The production halls are designed as a reinforced concrete prefabricated skeleton, sheathed with ‘sandwich’ panels with a roof of classic concept.
Parker Hannifin Corporation is an international leader in motion control technology and systems, currently employing around 55,000 employees in 50 countries and generating revenues of approximately $ 11 billion.
The company K4 a.s. developed the project documentation for the production halls, the project manager of the contract was Ing. Roman Havlišta.
For the investor Tesco Stores Czech Republic, we carried out the construction and remodelling of the following commercial units in the form of project management: Tesco Boskovice, Tesco Břeclav, Tesco Brno Shopping Park, Tesco Campus Square Brno, Tesco Frýdek-Místek (completion of hypermarket and shopping gallery), Tesco Havířov, Tesco Jihlava, Tesco Karviná, Tesco Kroměříž, Tesco Martin, Tesco Opava – hypermarket and shopping gallery, Tesco Ostrava in Třebovice – shopping gallery and tenant coordination, Tesco Písek, Tesco Přerov, Tesco Šaľa, Tesco Trnava, Tesco Uherský Brod, Tesco Valašské Meziříčí, Tesco Veselí nad Lužnicí.
For the investor Tesco Stores ČR, we prepared various phases of design work on the projects listed below, such as design documentation for building permits, construction execution, author's supervision or performed engineering activities.
Expansion of the Tesco Pilsen hypermarket
Hypermarket Tesco Vyškov
Tesco Express – Bělehradská, Prague 2
Tesco Brno Juliánov
The idea of the Brno Technology Park was created in the early 1990s. The urban concept of the British architect Peter Foggo gradually led to the implementation of a bold plan, which had to be modified over time for various reasons, but the basic urban idea – to integrate industrial, technological and administrative functions naturally into the urban structure – has been fulfilled. The administrative complex Czech Technology Park Brno is a campus-type business park, which includes retail, restaurant and other services situated in a pleasant green park.
Our company started cooperation with the Technology Park in 2005. Gradually, until 2017, we conducted design work, engineering and construction management on several stages of the construction of this park. We participated in the construction of office buildings and high-tech production halls for variety of renowned companies such as FEI Czech Republic, Siemens, SGI, Timken, Český Mobil, Honeywell Controls, Symbol Technologies, Red Hat, and IBM.
The fit outs were implemented in the form of construction management.
Czech Post
Oracle
Sberbank
Vltava-Labe-Press
Wabco
The Rosum Office Building in Bratislava, Ružinov district is one of the most modern office buildings in Slovakia. The leasable area of 22,000 m2 of office and retail space is built to the highest possible standard. The building consists of two towers connected by a common reception. Both towers also share a common car park, which is located on 2 underground and 3 above-ground floors. In addition to the office space, Rosum also has a retail area for shops and services. AB Rosum is located at the intersection of Bratislava's Ružinovská and Bajkalská streets, which gives it excellent traffic connections. The adjacent city parks and water areas are also an undeniable advantage, adding natural elements to the location. In terms of sustainability, the building is certified according to the internationally recognized LEED system at the GOLD Level. The contract was managed by K4 a.s. managers using the Construction management system. Other services provided by K4 a.s. to the client were Investor Technical Supervision, HSE Coordination, Document control, and Cost control.
Professional consulting and construction management services during the implementation of construction modifications of the Scuderia Čistovická Car Showroom in Prague, which consisted the original shop’s demolition, relocation of utility networks and subsequent construction of a new shop. The contract was managed by the Construction management system.
Scuderia Prague a.s. is the only official sales and service representative of the Ferrari, Maserati and Abarth brands for the Czech Republic.
The television studio in Běhounská Street, where Czech Television had operated for 55 years, was gradually losing its ability to meet the needs of television production and broadcasting in the 21st century. Therefore, our company prepared an adaptation of the former office building and its extension in the Líšeň district to a new modern Brno studio. Construction of the building complex began in November 2014 and was completed in the summer of 2016, when the staff and television equipment was moved in. The building consists of administrative space including the necessary facilities and three separate studios. During the preparation and implementation of the construction of the new studio, K4 a.s. performed project management, technical supervision and price consultation.
To achieve a higher level of safe operation of the nuclear power plant, the construction of two fan towers and two super-emergency PG power supply facilities at the Dukovany Nuclear Power Plant was proposed.
The new cooling towers with fans are 17 metres high and, compared to the existing 125-metre-high cooling towers, are more resistant to seismic effects and extreme wind conditions, including tornadoes or prolonged high temperatures. The new cooling towers are primarily for cooling the plant's safety systems and the existing 8 cooling towers will be retained for cooling the turbine condensers. The terminal heat sink buildings will remove residual heat from equipment where long-term cooling failure cannot be allowed.
K4 a.s was the technical supervisor of the investor on the construction site.
Our company has elaborated the project documentation for the building permit/construction change before completion and construction execution for the X-Bionic Arena sports hall project in Šamorín. The sports hall will be a part of the X-Bionic sphere Šamorín complex.
The new sports hall should serve mainly for ball sports, the total capacity of the auditorium of the central multifunctional arena is 5000 seated people. The lower part of the tribune is telescopic, and VIP boxes are located in the upper part of the auditorium. The arena meets the criteria for international matches, television broadcasts, and cultural uses. In addition to the central arena, there are also two training pitches inside the facility.
Previous stages of PD: Becker architects
Visualization by K4 a.s.