The building is part of the premises of the Aviation Institute of University of Technology in Brno. The main purpose of the building is research activities related to small aircraft construction. The individual parts are designed and manufactured here. Then static and crash deformation tests are carried out on them. The results of these tests are evaluated in workrooms and laboratories.
Residential complex of 4 apartment buildings on a shared base of 3-storey underground garages. On the ground floor of the four-storey residential buildings, office space and commercial units are designed, and a total of 86 residential units are proposed in the complex. Three private gardens are located between the buildings.
Preparation of architectural study and complete project documentation of the complex.
In 2004, a study was made on the possibility of adding an indoor swimming pool to the primary school, later this idea was extended to building an aqua centre, which was missing in Brno. In 2006, the architectural office K4 a.s. started designing the project. The construction itself started in April 2008 and lasted 2 years. Since the opening ceremony on 14 April 2010, more than 1.25 million visitors have visited the complex. The number of visitors is increasing year by year –from 185,000 in 2010 to 300,000 in 2015.
Newly built indoor swimming pool in Brno-Kohoutovice with a unique load-bearing wooden structure and pool hall cladding. The Kohoutovice swimming pool includes a 25 m long sports pool, a pool with attractions, a whirlpool, a 90 m long water slide, a wild river, and a sun terrace with a pool on the roof. It also includes a sauna, massage room, and air-conditioned fitness centre. The pool hall facilities include changing rooms with washrooms for visitors, a day bar, and a children's play area.
Preparation of the architectural study, documentation for the zoning procedure, documentation for the building permit, documentation for the construction contract, and author's supervision.
Waterpark website: https://aquapark.starez.cz/
Implementation of the first two phases of construction of the wood processing plant. In the first stage, the construction of the administration building, and the sawmill hall was carried out. In the second stage, the construction of a 5600m2 lumber and prism warehouse and preparation of infrastructure for the next stages took place. Study, complete project documentation, engineering and project management.
Two-storey extension of Pavilion I on the premises of the University Hospital in Brno-Bohunice to place a spinal unit and a traumatology centre with an intensive care unit and related examination and treatment facilities. The construction was carried out without interrupting the operation of the pavilion.
K4 a.s. performed the following services on the above-mentioned construction:
- technical investor's supervision of the construction and technological part during the implementation of the construction,
- technical investor's supervision of compliance with the principles of occupational safety, occupational health and environmental protection.
Renovation of a historic building in the city centre into a five-star hotel of the Barceló chain.
The current hotel building was built in the middle of the 19th century according to the design of the famous Viennese architect Franz Fröhlich. The original design called for a residential building with different types of rooms and a sophisticated staircase system. The palace facade contrasts with the romantic style of the interior.
The hotel on Šilingrova Square was created by reconstructing the dilapidated building of the Municipal Court, which used to house the district court and the municipal museum. This Neo-Renaissance building is now considered a cultural monument, formerly also known as the City Palace.
The five-star Barceló boutique hotel offers a total of 119 luxury rooms, conference rooms, as well as a spa and relaxation areas. From the fifth floor, guests can look out of the attic window straight into the starry sky above Brno.
K4 a.s. prepared the documentation for the construction and the documentation for the change of the construction before completion.
Our company performed project management services for the investor of the Ikea Group in the Czech Republic and Slovakia.
Expansion of the Bratislava shopping centre – 2007, PM, TDI, IN 693 mil. CZK
Reconstruction and extension of IKEA department store in Brno – 2008, PM, TDI, IN 450 mil. CZK
Extension of AVION Shopping Park Ostrava – 2008, PM, TDI, IN 850 mil. CZK
Avion Shopping Park Bratislava – Phase III a Annex, 2009, PM, TDI, IN 446 mil. CZK
On the OC Nisa Liberec project, our company carried out design work in the documentation phase for the selection of the contractor, author supervision, engineering activities. The construction of the centre and rental units was managed by the project management division in the form of construction management.
A new residential facility for visiting professors, PhD students and international students is located near the Brno city centre. The building with 10 above-ground and 1 underground floor contains 68 residential units and 82 parking spaces on two lower floors and another 9 on the ground. As part of the services, the residence has a 24-hour reception and a roof garden on the 2nd floor.
The architectural study, design documentation, passport nation and permit to the demolition of the existing building.